top of page
Step change in injectivity from Fishbones installation

5 December 2018

Fishbones Stimulation Technology was recently deployed in an existing water injector in a tight limestone formation in the Middle East. Prior to stimulation the well was shut in after suffering from low and unsustainable injection with high surface pressures.

Following the successful deployment of a 40-subs Fishbones Jetting system the injectivity was significantly increased. The well is now on sustained water injection at rates in excess of any in the past with much lower surface pressures. 

 

A second system deployment in another water injector with this operator will take place later this month.

Media contact

For media enquiries please contact:

Blair Grant

Project Neon AS

E: blair@project-neon.com

bottom of page